Follow us on our journey as we integrate a computer controlled router into a traditional museum exhibit shop.
Friday, September 12, 2008
Day Four Progress
Plywood base and MDF spoilboard installed.
Control box and VFD mounted, power installed. It turns out that there was enough room in the exiting conduit for not only the spindle and controls wiring, but the PC as well. May the sun never set on the glory that is the SNOMNH Facilities Staff. Thanks guys.
No comments:
Post a Comment